输油管道率的方法和步骤[18 CFR 342]

2020/12/12 16:29:43 次 0

PART 342 — OIL PIPELINE RATE METHODOLOGIES AND PROCEDURES [ 18 CFR 342 ]PART342 — OIL PIPELINE RATE METHODOLOGIES AND PROCEDURES [ 18 CFR342 ]Table of Contents 342.0 — Applicability. 342.1 — General rule. 342.2 — Establishing initial rates.[ Last…

PART 342 — OIL PIPELINE RATE METHODOLOGIES AND PROCEDURES [ 18 CFR 342 ]PART342 — OIL PIPELINE RATE METHODOLOGIES AND PROCEDURES [ 18 CFR342 ]Table of Contents§ 342.0 — Applicability.§ 342.1 — General rule.§ 342.2 — Establishing initial rates.[ Last FR update: 11/16/1994 ]§ 342.3 — Indexing.[ Last FR update: 09/03/2004 ]§ 342.4 — Other rate changingmethodologies.[ Last FR update:11/16/1994 ]Authority: 5U.S.C. 571–83; 42 U.S.C. 7101–7532;49U.S.C. 60502; 49 App. U.S.C. 1–85.Source: Order 561, 58 FR 58779, Nov. 4, 1993, unless otherwise noted.§ 342.0 Applicability.(a) Except as provided in paragraph (b) of this section,rate changes by oil pipelines shall be governed by this part.(b) Exception for the Trans-Alaska Pipeline.Thispart shall not apply to the Trans-Alaska Pipeline authorized by theTrans-Alaska Pipeline Authorization Act (43U.S.C. 1651, et seq.) or to any pipelinedelivering oil directly or indirectly to the Trans-Alaska Pipeline. § 342.1 ...


您尚未登录无法查看全部内容,点击登录。
北京闻道腾跃环境管理咨询有限公司
版权所有 京ICP备10216399 京公网安 备11010102000346号