标准钻孔采矿永久性专用方案[30 CFR 819]

2020/12/12 15:04:25 次 0

PART 819 — SPECIAL PERMANENT PROGRAM PERFORMANCE STANDARDS-AUGER MINING[ 30 CFR 819 ]PART819 — SPECIAL PERMANENT PROGRAM PERFORMANCE STANDARDS-AUGERMINING [ 30 CFR 819 ]Table of Contents 819.1 — Scope. 819.11 — Auger mining: General. 819.13 — Aug…

PART 819 — SPECIAL PERMANENT PROGRAM PERFORMANCE STANDARDS-AUGER MINING[ 30 CFR 819 ]PART819 — SPECIAL PERMANENT PROGRAM PERFORMANCE STANDARDS-AUGERMINING [ 30 CFR 819 ]Table of Contents§ 819.1 — Scope.§ 819.11 — Auger mining: General.§ 819.13 — Auger mining: Coal recovery.§ 819.15 — Auger mining: Hydrologic balance.§ 819.17 — Auger mining: Subsidenceprotection.§ 819.19 — Auger mining: Backfilling andgrading.§ 819.21 — Auger mining: Protection ofunderground mining.Authority: Pub. L. 95–87,30 U.S.C. 1201et seq.Source: 48FR 19322, Apr. 28, 1983, unless otherwise noted.§ 819.1 Scope.This part sets environmental protection performancestandards for surface coal mining and reclamation operations involving augermining. § 819.11 Auger mining: General.(a) Auger mining operations shall be conducted inaccordance with the requirements of part 816 of this chapter, except asprovided in this part.(b) The regulatory authority may prohibit auger mini...


您尚未登录无法查看全部内容,点击登录。
北京闻道腾跃环境管理咨询有限公司
版权所有 京ICP备10216399 京公网安 备11010102000346号